Phase 1 of the SUKE highway is now fully operational, and here are its toll rates!
SUKE Highway Toll Rates, Starting October 15!
The Sungai Besi-Ulu Kelang Elevated Expressway (SUKE) is no longer free for public use.
SUKE is now fully operational, with motorists charged RM2.30 at the Bukit Teratai and Ampang toll plazas for Class 1 vehicles.
That means motorists will pay RM4.60 to travel from the Phase 1 stretch from the Cheras-Kajang Interchange to Bukit Antarabangsa.
Once the third toll plaza at Alam Damai is open, and if it also applies the same RM2.30 toll rate, then it will cost Class 1 motorists a total of RM6.90 to travel the full length of the SUKE highway in either direction.
These toll rates officially take effect at 12:01 AM on Saturday, October 15, 2022:
Type | Vehicle Class |
Details | Toll Rate |
Car | 1 | Vehicle with two axles and three / four wheels (not including taxi or bus) |
RM 2.30 |
Lorry | 2 | Vehicle with two axles and five / six wheels (not including bus) |
RM 4.60 |
Trailer | 3 | Vehicle with three axles or more (not including bus) |
RM 6.90 |
Car | 4 | Taxi | RM 1.20 |
Bus | 5 | Bus | RM 2.30 |
SUKE Highway : Launched In September, Free For 1 Month!
SUKE was officially launched on September 16, 2022, with Phase 1 made free to use for one month.
The 16.6 kilometre stretch of Phase 1 of the SUKE highway runs from the Cheras-Kajang Interchange to Bukit Antarabangsa. The subsequent stretch from Sri Petaling and KESAS Highway to Cheras-Kajang will open at a later date.
SUKE will have three toll plazas – Alam Damai, Bukit Teratai and Ampang, of which only the Bukit Teratai and Ampang toll plazas are open.
Once fully completed, SUKE will have 14 interchanges in total – Sri Petaling, Sungai Besi, Alam Damai, Cheras-Kajang, Cheras-Hartamas, Bukit Teratai, Tasik Tambahan, Permai, Kosas, Pekan Ampang, Ampang Point, Ulu Kelang, Hillview, and Bukit Antarabangsa.
SUKE is notable for featuring Malaysia’s first helicoidal ramp – the Cheras-Kajang Expressway (CKE) connects to SUKE through two spiral loops.
Tragically, it was also involved in an accident that killed three people during its construction.
Read more : SUKE Highway Crane + Beam Collapse Kills 3!
Please Support My Work!
Name : Adrian Wong
Bank Transfer : CIMB 7064555917 (Swift Code : CIBBMYKL)
Credit Card / Paypal : https://paypal.me/techarp
Dr. Adrian Wong has been writing about tech and science since 1997, even publishing a book with Prentice Hall called Breaking Through The BIOS Barrier (ISBN 978-0131455368) while in medical school.
He continues to devote countless hours every day writing about tech, medicine and science, in his pursuit of facts in a post-truth world.
Recommended Reading
- DASH Highway Officially Open, FREE Until Nov 30!
- Toll Fares Reduced For Six Klang Valley Highways!
- Intel Planning Major Layoffs, Amid Market Downturn!
- Elon Musk Personally Blocked Starlink In Crimea!
- Apple Watch Explodes, Apple Tries To Cover It Up!
Go Back To > Travel | Business | Tech ARP
Support Tech ARP!
Please support us by visiting our sponsors, participating in the Tech ARP Forums, or donating to our fund. Thank you!